SERPLASA - Energy efficiency

Actions destined to encourage the energy efficiency and the use of renewable energies co-financed by RDEF (Regional Development European Fund) and the Region of Murcia:

  • Energy audit determining the energy-saving potential and assessing the opportunities of the final energy consumption decrease, and consequently, the reduction of the CO2 emissions sent out to the atmosphere.
    • Goal: Advancing in the assessment and betterment of the companies’ energy efficiency and particularly SMEs.
    • Processing status: Granted.
    • Total investment: 5.180,00 €
    • EU financial support: 2.486,40 €
  • Illumination equipment renovation with LED technology equipment with a better energy efficiency, reaching a decrease in the final energy consumption and consequently the reduction of the CO2 emissions sent out to the atmosphere.
    • Goal: Advancing in the assessment and betterment of the companies’ energy efficiency and particularly SMEs.
    • Annual energy-saving: 24,81 toe per year
    • Annual GEG emissions saving: 100,47 tCO2
    • Processing status: Granted.
    • Total investment: 66.692,00 €
    • EU financial support: 18.673,76 €
  • Diesel oil forklift trucks renovation with LPG forklift trucks which grant a reduced energy consumption reaching a reduction of the CO2 emissions sent out to the atmosphere..
    • Annual energy-saving: 15,27 toe per year
    • Annual GEG emissions saving: 61,20 tCO2
    • Processing status: Granted.
    • Total investment: 66.405,00 €
    • EU financial support: 18.593,40 €
  • Installation of high efficient Air ring cooling system obtaining the decrease of the final energy consumption and reduction of the CO2 emissions sent out to the atmosphere.
    • Annual energy-saving: 16,27 toe per year
    • Annual GEG emissions saving: 65,89 tCO2
    • Processing status: Granted.
    • Total investment: 98.000,00 €
    • EU financial support: 9.762,00 €
  • Installation of high efficient Air ring cooling system in two extrusion lines after verifying the obtained energy-saving results with the pilot project, obtaining the decrease of the final energy consumption and reduction of the CO2 emissions sent out to the atmosphere.
    • Annual energy-saving: 40,89 toe per year
    • Annual GEG emissions saving: 165,59 tCO2
    • Processing status: Granted.
    • Total investment: 372.928,08 €
    • EU financial support: 44.751,37 €
  • Compressed air equipment renovation with a higher energy efficient variable speed equipment, obtaining the decrease of the final energy consumption and reduction of the CO2 emissions sent out to the atmosphere.
    • Annual energy-saving: 11,37 toe per year
    • Annual GEG emissions saving: 46,05 tCO2
    • Processing status: Granted.
    • Total investment: 34.523,00 €
    • EU financial support: 9.666,44 €